Toilet waterproof belongs to one of the family hidden projects, if the original decoration did not do waterproof, did not do waterproof experiment, it is very easy to leak in the later period. Toilet water leakage do not want to hit the ground is the hope of many owners, after all, hit the ground to do waterproof really delay the normal use of the owners usually, in addition to a large amount of expenses, but the toilet water leakage in the end whether to hit the ground is not the owner said, but according to the actual water leakage position and water leakage reasons and other joint decisions, can not hit certainly not hit.
Why the bathroom leaks
There are many cases of toilet leakage, and each repair method is different. When you find that the bathroom leaks, first look at what is the water leakage, such as the water leakage of the waterproof layer, it is necessary to make a waterproof layer again, if it is a water pipe problem, you need to repair the water pipe, you can change the water pipe. Bathroom leakage do not want to hit the ground must first check where the leak. The closed water test is carried out in the bathroom, the water is placed 3cm high, and the floor of the downstairs residents is checked whether there is water leakage during the closed water process. If the water leakage is serious, it proves that there is a problem with the waterproof layer; If there is no change after the water is shut off, there is a problem with the water pipe.
If the toilet is waterproof layer leakage, rather than the upper and lower water pipe leakage. It can be repaired without smashing the ground. The maintenance method is very simple to use a new type of permeable waterproof agent on the surface of the toilet to do again, so that the water does not enter the ground and flows directly from the waterway. If it’s a water pipe problem. And the water pipe is underground, you need to consider smashing the floor, but you do not have to redecorate the bathroom. For example, if the water inlet pipe leaks, it can be changed to open the pipe, and it does not need to leak the water pipe. If it is a water leakage pipe, it is also necessary to find the specific location of the water leakage, according to the situation to determine whether it is partially planed to solve the problem, it is not necessary to hit all.
Generally speaking, the toilet water leakage refers to the water leakage on the ground, which not only affects the use of their own homes, but also affects the use of people downstairs. Traditional water leakage repair needs to break open the floor tile and make a waterproof layer again, but if you find the part of the water leakage, and it is not serious, you can only slightly do that part of the waterproof layer. It’s possible to have a leaky bathroom without hitting the floor.
Judge water leakage: First of all, we need to judge the main reason for the ground water leakage, in the bathroom closed water test, put the water to 3cm high, in the process of closing water to see whether the floor of the downstairs residents have water leakage, if the water leakage is serious, it is proved that there is a problem with the waterproof layer; If there is no change after the water is shut off, there is a problem with the water pipe.
Water pipe leakage solution: For the ground security pipe, hot and cold water pipe leakage, you should first dig the floor tile, find the joint of the water pipe, seal treatment, if the water pipe itself cracks, need to replace the water pipe, after the treatment of the water pipe re-buried, repair the waterproof layer within the scope, restore the floor tile.
Waterproof layer water leakage solution: If there is a problem with the waterproof layer on the ground, it is necessary to shovel off the floor tile, find the waterproof layer with the problem, and then seal with the leakage treasure or water stop strip, and then waterproof construction, if the leakage point is close to the wall, the facade of the tiles need to be shoveled off together, the waterproof layer should also be done on the wall, the closed water test after treatment, and then re-lay the tiles after reasonable.
Toilet leakage does not hit the floor solution
1. Clean the dust, oil and water on the surface, and keep the surface dry; If the tile joint is filled with caulk, you need to use a knife to mark a small slot; In the tile surface, tile joint, wall joint, pipe root and other cement parts, spray penetration waterproof agent, must be sprayed evenly; After the waterproofing agent 9 is dry (about 2 hours later), fill all tile joints and damaged and defective parts with caulking paste, and strengthen the weak links around the root with caulking paste brush; The joints between the ground and the wall and around the pipe roots are made of plastic-steel mud as waterproof edges; After the completion of waterproof construction, the construction site can not be flooded within 24 hours.
Second, cut the floor tile with a batch knife (conducive to water-repellent infiltration) and clean the garbage. Plug the floor drain. Dilute the penetrant with 2-5 times water and pour it on the floor. Like a bathroom storing water. If not satisfied, use a sweep 箒 to sweep from low to high (through the brick cracks to leak the product under the floor tile) until all leaks under the floor. After 2-5 hours, dilute the crystalline components with 2-4 times the amount of clean water and pour them on the floor. Like a bathroom storing water. If you are not satisfied, you can sweep 箒 from low to high (after infiltration, it reacts with cement hydration products to form insoluble colloids or crystals to achieve waterproof purpose) until it is no longer permeable. Clean up, tile pointing, construction is over.