HOMENews

Characteristics of epoxy floor paint Construction method of epoxy floor paint

Characteristics of epoxy floor paint Construction method of epoxy floor paint

2023-06-27 09:06:19

Epoxy floor paint is a kind of paint made of epoxy resin as raw material, curing agent, diluent, solvent, dispersant, defoamer and some fillers. What are the characteristics of epoxy floor paint? Let’s take a look at it.

【 Characteristics of epoxy floor paint 】

1. Decorative

Epoxy floor paint has various colors, bright color, and color is not easy to fade. And there are many types of epoxy floor, non-vibration non-slip floor, wear-resistant floor, users can selectively increase, and can be flexible and changeable construction according to specific needs, so that modern people who pay attention to personality and fashion are more acceptable.

2, the construction is simple

Epoxy floor construction only needs to be applied several times on the ordinary cement floor, and it can be used within a few days after the completion of construction, which is the only choice for large-scale factories and supermarkets that require tight time.

3, strong and durable

A single cement floor wear resistance, robustness can not reach the factory and other environments. On the basis of cement floor, the use of floor materials can enhance the adhesion of cement floor and make the ground stronger.

4. High cleanliness

Ordinary cement floor is not easy to clean because of rough, uneven and other problems, and it is difficult to meet certain cleaning standards. Tile floors are more difficult to clean due to gaps. The use of epoxy floor paint the overall coating characteristics of the ground to solve the above problems, so that cleaning in more convenient and quick, you can use mop, rag simple cleaning is very clean, you can also use epoxy floor automatic cleaning machine, very easy to save effort, and the effect is very good.

【 Epoxy floor paint construction method 】

First, construction preparation

Before the construction of epoxy floor, we must first prepare for construction, including epoxy floor paint materials and construction equipment. Among them, epoxy floor paint materials need epoxy primer, epoxy medium coating, epoxy top paint, putty powder, quartz sand, diluent; Construction equipment needs grinding machine, sander, milling machine, shot blasting equipment, vacuum cleaner, broom, mixer, weighing, bucket, roller, floor paint (flat mouth, round mouth) trowel, flat scraper.

Second, grass-roots treatment

Before the construction of the epoxy floor, the epoxy floor foundation should be treated, which is mainly to expose the damaged, sandy, loose, viscosity is not strong, cracking, empty drum parts completely, polish the floating mortar, old epoxy cement caking, etc., and clean up the floating ash and pollutants on the base surface, and then you can start the epoxy floor construction work.

Third, construction steps

(A) epoxy coating construction

1, before construction, ensure that the ground is clean, if there is debris adhesion to remove;

2, the epoxy resin and curing agent according to the correct proportion of mixing.

3. After mixing evenly, apply with a scraper or roller.

4. Immersion is required to strengthen the adhesion force.

5, wait for the first dry solid and then apply epoxy coating.

(2) epoxy medium coating construction

1, before construction, ensure that the ground is clean, if there is debris adhesion to remove;

2, the epoxy resin and curing agent according to the correct proportion of mixing, and add a certain proportion of quartz sand;

3, after mixing evenly dumped on the ground, the use of trowel according to the design thickness of the material evenly trowel to increase strength and impact resistance; Make the ground firmer and more resistant to pressure.

4. After the medium coating is dry and solid, it is polished to smooth the flow hanging objects and particles on the surface.

5, dust disposal clean.

Inspection method: Whether the construction handover treatment is appropriate, the position of the kicking line is straight, and there is no separation from the wall.

(3) Construction of epoxy putty layer

1, On the clean ground, the epoxy resin and quartz powder according to the correct ratio of mixing evenly, using a batch knife evenly trowel on the ground to increase the combination between the coating and the surface layer, and further adjust the flatness of the ground;

2. Depending on the actual number of construction passes, it is required to achieve smooth and no holes, no batch knife impression and sand grinding impression.

Inspection method: The ground can be completely flat without holes, and the surface coating can be carried out without batch knife printing and sand grinding.

(4) epoxy coating construction

1, need to keep clean before construction, if there is debris adhesion need to remove;

2. Stir the B component of the coating material first; Then add curing agent to mix, stir thoroughly;

3, use a roller to evenly coat the material;

4. After the first coating is dry and solid, the second surface coating is constructed.

5, the surface of the flow with a trowel to scrape the trowel.

6, pay attention to the treatment of the construction junction; The coating should be uniform and no flow hanging.

Inspection method: The ground color is uniform, no flow hanging, no pinholes, smooth and smooth.

[Curing method of epoxy floor]

Epoxy floor paint is a product of high value, high quality and high requirements, and the correct use method can make the ground permanent as new, and can maintain a long service life. Specific suggestions are as follows:

1. After the completion of the construction of the flat, it can be put into use after 7-10 days of maintenance. During the maintenance period, water or other solutions should be avoided to infiltrate the surface;

2, all employees entering the workshop must be replaced with rubber soled shoes (can not wear black shoes with foam bottom) (so as not to bring the sand outside into the workshop and scratch the ground);

3, all hardware: such as iron chairs, iron tables and iron shelves, etc., must use its feet with soft plastic, rubber wrap or paper cushion to avoid scratching the ground during use;

4, the tractor plate should be fully lifted off the ground, please pay special attention to the Angle of the plate should not scratch the ground when turning;

5, clean the ground, please use a soft absorbent good mop or dry and wet dual vacuum cleaner, can be cleaned with water or detergent, but please pay attention to the ground wet and slippery;

6, if the use of a long time caused by wear or scratch, small area can be partially repaired, if the area is large, it is recommended to roll again;

7. Before the equipment enters the factory, lay a cardboard box bottom on the floor to avoid scratching the ground during the transportation of the equipment;

8, the wheel of the cart, please use hard or elastic rubber wheel, and the plant inside and outside the separate use;

9. Waxing can be done according to the requirements of the ground (the effect can prevent scratches on the ground).