1. When decorating, there is no need to cherish the floor drain, expose it to the outside, and stones or other small objects fall down, causing pipe blockage.
Supervision reminds: this is the details of the decoration, but indirectly reflects the quality of the construction team. These small places as long as a little attention can be, but can save the owner a lot of unnecessary poverty.
2, the basin should have made a support, to secure and cherish the basin, but because of the worker’s negligence in advance, now had to use the board to support, but not because of the good distance, resulting in the two phases of the joint situation.
Supervision reminder: this continuous error, really improper. Reflects the workers unusually not serious, careless things attitude, for such a construction team, the owner still avoid.
3, the workers did not think clearly when the construction, after the basin installation, only to think of the sewer pipe has not been installed, the effect can only be installed outside the basin column, it is very difficult to see.
Supervision reminder: this detail reflects the installation workers’ craft problems, it seems that in the selection of construction team also have to find a quality clearance, on the end of the almighty to prevent such embarrassment.
4, due to the construction of the poor thinking, such as the toilet installed after it was found that the power socket was covered by the toilet half of the Thai department, the use of abnormal unlucky.
Supervision reminder: should be considered in advance, so as not to install after found, hate Mo.
5, after the bathtub was installed, it was found that the water was not unobstructed, and there was no facility. It was only possible to open an opening next to it and re-drain the water pipe as a rescue measure.
Supervision reminder: such hidden projects must be made in place in advance, and strict check at the time of acceptance. If the owner is busy and has no time, you can also ask a self-supervision to help.
6. After the workers finished lifting the ceiling, they found that the exhaust port was not sealed, so they had to remove the ceiling and repair it again, which delayed the construction period.
Supervisor reminds: Yunyun’s attitude towards construction is really hard to rest assured. Fortunately, it has not caused serious results, otherwise it will bring a lot of poverty and loss to the owner.
7, the owner is ready to apply a circle of waterproof glue next to the basin, but in order to make a profit did not go to the professional building materials supermarket, but casually bought in the shop downstairs, who knows how long it will be moldy, not ugly, let the owner hate.
Supervision reminder: for similar waterproof glue equipment, the owner must not be due to a moment of laziness or the existence of lucky psychology and careless purchase, so identify the professional brand is more reliable, spend a little spirit, but in return for the future of worry.
8, in order to catch up with the progress, the workers did not even do the necessary waterproof construction bathroom, directly installed the furniture first.
Supervision remind: the construction of sanitary ware as usual must include waterproof construction of this process. The same usual sequence is to smooth the wall, the ground, and then do waterproof construction, and then the wall tile, and the wall waterproof to do more than 1.8 meters.
9, the owner bought a bath bucket, but the decoration workers as a pile of debris garbage can.
Supervision reminder: during decoration, the main should urge the decoration company to do a good job of real-time sorting and cleaning on the site. For all kinds of equipment entering the site in advance, the precious measures should also be accepted in response to prevent unnecessary damage.
10, installed in the toilet water pipe was accidentally broken by workers, broken pipe so ugly exposed there, there is no disposal.
Supervision reminder: as usual, the arrangement principle of sanitary water and electricity pipes is to go to the top, to walk on the ground. Laying water pipes on the ground not only makes it difficult to prevent the signs shown in the picture, but also affects the laying of tiles.