Five important links of home decoration acceptance

Five important links of home decoration acceptance

2023-03-30 05:03:45

In the home decoration, not only to buy high-quality building materials, do a good job of construction planning, but also the best acceptance work, so as to ensure the quality of home decoration. Newbies and owners often don’t know what to check and what the standards are. The following Fu Wo home network summarizes the five important links of home decoration acceptance, let’s have a look.

Luoyang home decoration acceptance of the five important links

1. Before the entrance

Check whether the demolition and renovation project conforms to the provisions of the contract, whether there are safety risks, whether the wall is clean, and whether the quantity, grade and specification of the materials on the site are consistent with the pre-agreed.

2. Water and electricity road

The acceptance of the second stage should be a separate acceptance of the waterway and circuit transformation. Consumers should check whether all the transformation lines are smooth, reasonable layout and standardized operation under the operation of professional hydraulic or electrician, and reconfirm the actual size of the line transformation. Only after the line is changed, the putty worker can seal the wall and scrape the putty.

3. Size of woodworking

The third acceptance should be finished after the carpentry foundation, at this time, the ceiling and gypsum line in the room should be completed, the kitchen and bathroom wall tiles have been pasted, and the wall should be painted after scraping two times of putty. The acceptance of this stage is very important, consumers should carefully check the drawings, confirm the size of each part, if found inconsistent place, to prompt the construction team to modify.

4. Quality of woodworking

When the veneer of all fine wood products is pasted and the wood wire is glued, the consumer can carry out the fourth stage of acceptance. This time is basically in the half of the construction period, this stage of the inspection to focus on the color difference and texture of wood products and a large area of smoothness and gap is uniform. Once the woodwork is finished, the oiler can begin the priming process and all floor tiles should be finished in this stage, the fifth stage in the phased acceptance process.

5, after completion

The acceptance content in the last stage is the most comprehensive and thorough. Consumers should check the installation of treadboards, sanitary ware and hardware, whether the top paint of the wood products is in place, whether the paint of the wall and top surface is uniform, whether the electrician installed the panel and lighting position is appropriate, whether the wiring connection is correct. In addition, the consumer should require the construction team to thoroughly clean the room before withdrawal.

The above is the home decoration acceptance of the five links of some introduction, hope to help you. If you want to do decoration price for home for free, you can log in Fuwojia home network, Fuwojia home network to make decoration province more province.