Home decoration acceptance knowledge

Home decoration acceptance knowledge

2023-07-06 05:07:57

New house acceptance is very key, as a future warm nest, owners must not take the acceptance link after the completion of construction lightly. So as a basic acceptance process, what are the key parts of acceptance? First of all, you need to see whether there are cracks in the wall, whether the ground is smooth and so on. Follow me to learn more about it.

Warm bedroom renderings

1. Whether the floor is flat

If you want to see whether the floor is flat, you only need to use a long ruler (or a special ruler with a level), against the wall floor, check whether it is flat, and observe whether there are scratches and cracks, and whether the wall has a burst point (burst point: Quicklime in mature lime due to mixing is not good, spread on the wall will form a burst point, with iron knock “burst point”, you will find a large area of loose, falling off and other quality problems.)

2. Whether there are cracks on the wall

While checking whether the wall is flat, it is also necessary to see whether the wall has cracks (four common cracks: strength cracks, settlement cracks, temperature cracks, deformation cracks), whether there is an external leakage of barbed wire, steel bars. If the above wall problems are found during the inspection, the developer can finally help to repair them after signing.

3. Whether there are defects in the indoor stairs

Mainly look at the smoothness of the stairs, whether there are defects.

4, doors and Windows installation track is smooth

In terms of door and window inspection, the most important thing is to check whether the track of doors and Windows is smooth. Especially the friends of the casement window, must pay attention to whether it can be closed tightly. Otherwise, the wind will enter the house, especially in the cold north, and you will be miserable in the winter. If these problems are found in the reinspection, directly inform the developer, they will soon fix it, if you have signed, then find the developer to deal with these problems. Then their efficiency is very fast.

The second aspect is to check whether the Windows and doors of the new house are damaged. Whether the window frame is deformed. If you find anomalies, pay close attention to the developer to solve, this is a matter that needs your attention, especially the doors and Windows of each room should be carefully checked to avoid unnecessary loss of money.

5, enter the door whether there is bumping and painting

Need to carefully check whether there is bumping and painting into the door, strictly speaking, the door body inside, outside, the top surface must be painted. The gap of the door should not be too large, the opening and closing of the door without special sound, the four sides of the door should be close to the door frame, the gap on one side of the door lock should not be too large, and don’t forget to test the lock, mainly to see whether the key is good to use, and whether the door lock is installed firmly. Other important points are the sound insulation of the door and the degree of sealing.

Modern living room renderings

6, balcony equipment is not damaged

When accepting the balcony, it is mainly to see whether the ground of the balcony is smooth or damaged, followed by whether the window equipment of the balcony is intact.

7, the height can not be less than 2.8 meters

As a building, the height of the building is generally 2.8 meters, the actual height can not be less than 2.6 meters, the actual height of the height of 3 meters can not be less than 2.75 meters, but the residential height can not be less than 2.8 meters.

8, whether the water supply is complete

In the inspection of who to pay attention to, mainly to see whether the faucet of each water pipe in the room has a water supply, whether it is complete, (including the faucet in the pipeline well in the corridor).

Living room renderings

9. Whether the drainage is normal

After the water supply, the remaining big problem is the solution of the drainage problem. The location of acceptance drainage is mainly in the basin, toilet, bathtub, toilet, kitchen, balcony floor drain, etc. (should hear the sound of rumbling and no water on the surface). The qualified ground should not have water, because the floor drain is the lowest place, but a certain height of the later paved ground is set aside around the floor drain of the rough-built house. Make the water flow as big and urgent as possible, look at the water pressure, and test the drainage speed.

10. Whether the electric is consistent with the quantity bought

The electrical inspection is first to check whether the amount of water and electricity in the electricity card and water card is consistent with the amount bought.