Interior decoration is a big deal for every family, in the process of home decoration do not think that the decoration project to the decoration company is finished, the supervision of the construction is also very important, today with the Fuwojia home network to see how to do a good job of home decoration construction supervision work, hope to bring you help.
The wall should be painted as a whole to avoid color difference
Before painting the wall and paving the floor tile, it is necessary to do a good job of the wall or the ground base batching treatment. The base of the new house can be polished with coarse sandpaper, and the wall of the old house, the putty layer needs to be removed before the next process. If you do not take such a method of construction, light will cause the wall uneven, wall paint after brushing color difference; Heavy wall paint discoloration, cracks and even peeling phenomenon.
In the paving of wall brick and floor tile, the owner should pay attention to the tile can not be directly laid on the surface of lime mortar, stone plaster and lime paste, and it must be laid after the basic treatment is clean. The adhesive mortar used between ceramic tile and the base should be deployed in strict accordance with the construction standards and proportions, that is, the cement purity should be high, or the use of new ceramic tile binder, can not be deployed at will. When painting the wall paint, we must pay attention to whether the wall putty layer is uniform and smooth, and whether the grinding and rolling coating are in place.
Wall paint is a common home decoration material at present. It can be painted, rolled or sprayed in the construction process. Wall paint generally needs to be painted more than two times before it is qualified. If the construction personnel in the construction is not serious, the coating is not thick enough, the wall often appears color difference, especially the dark color of the wall paint is more prone to this problem. Now the wall paint is water-soluble paint, before the use of water to add, deployment of good wall paint to a finish, the same color of paint is also best a finish. If the wall needs to be repaired after the construction, it is necessary to paint the whole wall again.
Home decoration pay more attention to the construction process must be supervised
Water and electricity pipelines should be well protected to avoid blockage
After the decoration of the home sewer road blockage problem, in fact, is caused by the construction of management is not standardized. Some workers may unintentionally dump concrete fragments containing cement and sand down the drain, which can cause problems in future sewer lines.
The owner must strictly supervise when supervising the work and do a good job of protecting the sewer pipe mouth. After finishing the water work, fill all the washbasins, kitchen dishes and bathtubs with water to see if the water is smooth and if there is leakage in the pipes. After completing all these steps and there is no problem, the acceptance can be considered.
Because the current circuit uses dark line, has strong concealment. Some owners check in after the use of electrical appliances, especially some of the larger electricity consumption of electrical appliances when there is hot phenomenon, some inexperienced owners tend to think that high-power electrical appliances caused trouble, in fact, this is not the case. Such a situation is likely to be caused by electricians in the installation of sockets, switches and lamps, not according to the construction requirements of wiring.
In this regard, the owner is reminded that electricians must be strictly required to operate in accordance with the operating rules during construction. After all switches and sockets are installed, they must be powered on to observe whether there is heating phenomenon, so as to avoid unnecessary losses in future use. Find the problem to replace the wire or socket on site.
It is understood that in the construction of home decoration, most wires are worn in a special vc tube, buried in the wall. In order to avoid these hidden dangers, it is best for the owner to buy brand-name wires according to the electricity load, rather choose thicker wires. After electricity inspection, but also let the water electrician or decoration party to leave a “pipeline diagram” for future inspection and maintenance.
I hope the above content can bring you a favorable reference, we will continue to work hard to share more useful decoration knowledge. You can also log in our website, learn more about the decoration design and decoration prices. Fu Wo home network is the most professional and cost-effective Fu nest platform in the field of domestic decoration, will make you satisfied and return, thank you for your support!