With the soaring housing prices, buying a house is a big deal for the people, most consumers because of the lack of professional knowledge of the inspection and can not make a correct and rational judgment, inspection is to find the problems and security risks, in order to owners of their own future to live in the house has a correct and comprehensive understanding. What details should we pay attention to in housing inspection? Here is to introduce it to you, I hope to help you.
Building acceptance diagram
1, check the quality of the house in detail, including doors, Windows, balconies and other parts of the cracking phenomenon; (Balcony crack is dangerous)
Because the new house is empty for a long time, there will be some dust and construction waste in the door and window track, so you must not be very impulsive, push and pull the door and window with brute force, when you feel a sense of obstruction, carefully check it, you can see it with a broom.
2, check the wall flatness, whether there is water seepage, whether there are cracks.
In particular, check whether some walls have water traces, especially some gables, kitchen sanitary tops, external walls and other places, if there is, be sure to find out the cause as soon as possible.
Building acceptance diagram
3, carefully check the ground for empty shell cracking.
If there is an empty drum, be sure to instruct the accompanying property personnel to repair it as soon as possible, otherwise it will easily break through the floor in the renovation and hinder the neighborhood relationship. Above 2-3 items available tools small hammer and gauge.
4, water and coal smooth and normal use.
Open the faucet to check the leak, make the water flow as big and urgent as possible, look at the water pressure, and try the drainage speed. (Usually a new house will be equipped with a simple faucet for the owner). Use a multimeter to measure whether each strong or weak power is unblocked.
Acceptance wall diagram
5, acceptance of the water, first with basin water, and then to the various water, respectively, basin water, bathtub water, toilet water, kitchen and sanitation and balcony floor drain, basically each water outlet should be filled with two POTS of water, should hear the sound of rumbling and no water on the surface.
After doing this, confirm that there is no problem, and take a plastic bag to cover the water mouth as soon as possible (such as the basin water, the bathtub water, the toilet water), and then bundle it, and the water such as the floor drain needs to be stuffed (remember to leave a position that can be pulled off).
6. Acceptance of ground launching. Put water in the toilet, just shallow (about 50px high). Then make an appointment for the owner downstairs to check the ceiling in his bathroom in 24 hours.
After all the water is used up, the water meter should be opened again, see the water meter number clearly, record it, and record the meter number at the same time.
7. Check whether there are omissions in the facilities and equipment specified in the sales contract, and whether the brand and quantity are consistent; Usually, there shouldn’t be a big problem in this area, but do check carefully.
8, measure the height of the building, with a 5-meter tape measure can, sampling data source location and specific data, it is best to put the water meter, electricity meter numbers, building height, toilet pit distance, bathtub length and width, shower room size, ceiling height are recorded in a small book of their own, while some acceptance of the house data and problems written on the paper provided by the property company.