House renovation construction steps explained

House renovation construction steps explained

2023-03-06 03:03:16

When we renovate a house, some novices have no contact with it and often encounter various problems in the renovation and do not know how to solve them. In fact, as long as we understand the steps of house renovation, so that we can avoid a lot of trouble, but also to shorten the renovation period. What are the steps in house renovation? How should we decorate it? Here are the steps of house decoration construction for you to learn together.

House decoration step one: civil construction stage

① Design a good house drawing, demolition of walls, masonry walls and other preliminary transformation. The choice of design drawings, including the choice of designers, is critical.

② Observe the lines, chisel line grooves, plumbing and electrical renovation and acceptance.

③ seal buried line groove concealed plumbing and electrical renovation works, do waterproofing works, bathroom, kitchen floor to do 24 hours closed water test.

④After doing the above steps, you can paste the wall and floor tiles to the bathroom and kitchen.

(Decoration of houses is a complicated process)

European style living room design effect

House renovation steps two: the grassroots treatment stage

①First of all, in general, the first carpentry to operate, hanging ceiling, plaster corner line.

② package door cover, window cover, making wooden cabinet frame.

③Synchronous production of various wooden doors, modeling doors and flat press doors.

④Brush dustproof paint for wooden panel.

⑤Window sill marble countertop leveling and laying.

⑥Paste wood veneer panel, line making and fine installation.

⑦Wall grass-roots treatment, grinding, leveling.

⑧ furniture, doors and windows side joints paste stickers (protective edge).

House decoration step three: fine treatment stage

①Wall painting at least three times.

② furniture painting into the field, fill nail eyes, paint.

③ deal with the edges, laying floor tiles, solid wood or laminated wood flooring, waterproof marble strips, skirting.

Home decoration diagram

④Lamps, switches, sockets, sanitary ware, handles, door locks installation and commissioning.

⑤ clean up hygiene, floor tile patching, withdrawal of the field.

⑥Internal preliminary acceptance of the decoration company.

⑦ three parties to make an appointment time for formal acceptance, at this point we can see the results of their hard work.

Notes for new house renovation.

1, the first step is carried out when the demolition of walls masonry process, renovation can not be arbitrary in the bearing wall piercing, removal of the wall connecting the balcony and doors and windows and expansion of the original scale of doors and windows or another built windows and doors.

2, because the balcony is a certain bearing weight, so we are in the procurement of decorative items for the balcony, should try to choose a small load of information to prevent the balcony overload overturned.

3, toilet and bath waterproof leak-proof work also have to pay attention to the place. In general, we do the following treatment: before decorating the toilet and bath, first block the floor drain, put more than 5 cm of water, drenching experiments, if it is leaking, it is necessary to redo the waterproofing; if it is not leaking, but also in the construction of careful laying ground, do not damage the waterproofing layer and private changes to the water and heating system.

4, in the construction should pay attention to prevent in the concrete round hole plate cut holes, drilling, hanging ceiling and installation of art lighting.

5, kitchen decoration do not place the gas stove in the wooden floor cabinets, not to mention the gas main valve package in the wooden floor cabinets. Once the cabinet on fire, the gas valve in the fire is difficult to close, the results will be unimaginable.