1. If it is a small area of soaking water, it is recommended not to pry up the laminate floor to dry, which is easy to cause hard damage to the laminate floor, and may cause serious results that can not be restored. It is best to quickly remove the floor kicker line, expose the expansion joint, rely on the expansion joint will be finished water vapor, proof seepage size difference, dry up usually takes about 30 to 10 days.
2, the occurrence of wood floor soaking water, to be in the shortest time the surface water on the wood floor dry. At the same time, use a vacuum cleaner to absorb water vapor in the splicing cracks of the wood floor, or use a hair dryer to dry with cool air, but never use hot air to prevent the outside caused by heat and dry deformation.
3, if it is a large area of water, should be notified real-time floor after-sales service, and in the case of keeping the floor stable shape will be carefully pry up the floor, according to the “well” font superposition placed to dry, with the weight of its superposition to prevent deformation, at the same time pay attention to not put in the sun exposure, should be placed in a ventilated place dry, The same ordinary circumstances for good quality solid wood flooring can be used again.
4. At the same time, you can also take a vacuum cleaner to absorb water vapor in the splicing cracks of the floor, or take a hair dryer to dry with cool air, but do not use hot air to blow, to prevent the outside caused by heat and dry deformation.
5, after the rescue is passive, rainy day is the best choice. Usually should pay more attention to the window don’t open big, to prevent the rain; Always check air conditioning, plumbing and washing machine for water leakage. Now the floor wax mainly plays a role of cleaning recuperation, can not be completely waterproof; There are some floor precious film on the market, like a layer of transparent coating, non-stick and slippery, waterproof and scratchproof, longer than floor wax, save the poverty of changing shoes at home.
6, has been soaked in water warped deformation of the floor, the best replacement, do not recommend plane arch department, and then repaint the disposal facilities, because the arch department after planing, repaint will lead to and other board color is not coordinated, and the whole board thickness is not equal, the force is different, easy to pit.