HOMENews

How long can a newly renovated house be occupied? Renovation must know

How long can a newly renovated house be occupied? Renovation must know

2022-12-08 09:12:55

It is understood that the country has no relevant industry standards for indoor environmental management. Only the mandatory standard of “Limited Substance Limits of Interior Decoration Materials”. However, there are all kinds of indoor environmental management companies in the market. For consumers, it is really confusing who to turn to for management. At present, the methods of several professional environmental treatment companies are similar: first air sampling and testing, and then use a specific potion for photocatalyst treatment. Doors and windows need to be closed to allow toxic substances to react chemically with the treatment potion. How long can a newly renovated house be available for occupancy? Several companies have different answers, some say 5 days, and some say it takes 20 days.

1. How long can you live in a newly renovated house? If you cook frequently at home, try to give up the open kitchen, as there will be oil fumes.

2. How long can I live in the house after renovation? The bathroom and kitchen have small water treasures, the hot water comes quickly, and it is more convenient to use.

3. Chinese-style range hoods have stronger suction than European-style ones, and European-style ones are not good-looking.

4. The power socket can be installed as much as possible, otherwise there will be extension cords everywhere in the house.

5. How long can I live in the house after renovation? A power socket must be reserved next to the toilet, otherwise the washlet cannot be installed.

6. Bathtub vs shower, if you choose one of the two, it is still recommended to take a shower, the bathtub is installed, and there are not a few people who have never taken a bath. The shower does not refer to the shower room. The glass of the shower room is still tiring to wipe, and you can also choose to hang a shower curtain.

7. How long can I live in the house after renovation? If there are 2 bathrooms, it is still necessary to install a bathtub. It is a good choice to soak large clothes and bathe the baby. There is no need for a jacuzzi. Also very expensive.

8. If it is not someone who does not cook, it is best to install an air conditioner in the kitchen.

9. How long can I live in the house after renovation? If you like to surf the Internet, reserve at least 2 network ports and more than 2 sockets on each wall of each room. Wireless routing can indeed solve the problem, but it is said that sometimes it is still unstable.

10. I regret that the kitchen flue is not blown out. Now as long as someone cooks in the building, the range hood must be turned on at the same time, otherwise the room will be full of oily smoke.

11. How long can I live in the house after renovation? The location of various sockets in the house deviates from the size of the furniture bought later, wasting a lot of sockets.

12. If you can buy it in the mall, don’t ask a carpenter to do it!!!!!! Unless the carpentry is quite good.

13. How long can I live in the house after renovation? The color of the floor should be slightly lighter, so it is not easy to see ash, but the kitchen and bathroom floor tiles should be slightly darker, so it is not easy to find hair everywhere, so that it is the most resistant to dirt.

14. It is best to install a ceiling fan in the restaurant, which is super comfortable.

15. How long can I live in the house after renovation? Try to have as much storage space as possible, and there will be more and more sundries that need to be stored after moving in.

16. It is better to use ceramic tiles for the wall of the balcony, which is more waterproof than paint.

17. How long can I live in the house after renovation? I regret buying and installing so many lights, but in fact, only a few are used permanently.

18. The washstand in the toilet is made of glass, which is super easy to get dirty.

19. How long can I live in the house after renovation? Group buying can’t save a lot of money, and what you buy is not good enough to sell. You have to believe that the sky will not be filled for no reason. A house is decorated in units of 10,000 yuan, so it’s better to go to the market to have a look, and it’s never out of date to shop around. Don’t be overwhelmed by the so-called “bargainer” at the group buying meeting and place an order on the spot. Even Liangju.com dare not say that its products are absolutely cheap, let alone other so-called group buying websites?

20. I forgot to install the switch at the head of the bed, and I have to get out of bed to turn off the lights every time. It is very sad in winter.

21. How long can I live in the house after renovation? Bathroom hardware, faucets and the like are absolutely worth every penny.

22. When decorating, try not to leave areas that cannot be wiped. It is difficult to clean the dead corners.

23. Families who plan to have children in the future must calculate the size and reserve a place for a crib next to the bed.

24. It is recommended that all faucets be installed with hot and cold water pipes. It will not cost a lot of money to install more during decoration, and it will be super difficult to remedy afterwards.

25. How long can I live in the house after renovation? The less impractical decorations in the room, the better. If the RMB is pasted on it, it will not be able to be torn off, and sooner or later it will become obsolete!

26. When buying anything, pay attention to the size of the door inside the house, don’t buy it and move it in.

27. The solid wood floor feels good but needs maintenance, and the composite floor is easy to clean.

28. How long can I live in the house after decoration? Invisible doors are not practical, and it is troublesome to open them for ventilation.

[How long can a newly renovated house live in? Renovation must know] 29. The walk-in wardrobe is good, but it is easy to accumulate dust. Open bookshelves, shelves, etc. (the kind without doors) are good-looking, but It is so painful to wipe, especially the book, a layer of dust.

30. The lamp must not be flushed up. After the lamp is hung up, wait for the dust to accumulate.

31. How long can the house be lived after renovation? The project of installing leakage protector and junction box of air switch cannot be saved, and it should be placed indoors rather than outdoors. Originally, I wanted to save labor and use the old junction box outside the door. , the electrician suggested putting it indoors and replacing it with a new one, and now I find that his suggestion is very valuable.

32. Leakage protectors and air switches must use famous brands.

33. The undercounter basin is more delicate than the overcounter basin, looks good and is easy to clean. Pay attention to the faucet of the under-counter basin. Considering the thickness of the basin edge, the faucet should be longer.

34. The top corner of the wall is beautiful without any decoration, but it must be clearly mentioned with the painter in advance when looking for a painter. The top corner snap line helps to straighten the top corner line.

35. How long can the house live after decoration? Surface treatment is very important before putty is applied on the cement surface of the line groove. It is suitable to treat the weak surface with cleaning balls.

36. Gypsum is suitable for filling larger holes on the wall. Of course, if the hole is too large, cement is still needed.

37. The back of the frosted glass must be protected from paint, it is difficult to clean!

38. How long will the house be able to live after the renovation? The faucet of the vegetable basin must be able to be opened and closed with the back of the hand. It is not easy to keep it clean with fingers, and it is difficult to turn it when the hands are oily.

39. The price of luxury automatic drying racks is too high. After comparison, it is found that some unknown brands are better than first-line brands in terms of structural design, but the price is much lower.

40. How long can I live in the house after decoration? You can consider using a metal socket installed on the ground. This kind of socket is more than 100 expensive, but it is very convenient. It is usually flush with the ground, and the socket can pop out when you step on it. Suitable for large living room . Or install it under the table in the dining room to insert the hot pot (to prevent wires from being hung up when walking back and forth).

41. Storage room. tx has already said it, but I didn’t make the cabinet door, it doesn’t look very beautiful, and the cabinet for clothes is easy to get dirty.

42. The bed’s boot rack (is that what it’s called). I bought a fabric bed from a professional bed company, and I spent 350 yuan to add this thing. There is a handle at the end of the bed, and the bed board will turn up to reveal the storage space underneath. It’s great!

43. How long can I live in the house after it is renovated? The double-bar towel rack is not practical! Currently, it is the same as the single-bar towel rack, and it is basically not to hang towels on the inner layer of the rack.

44. I feel that the trash can inside the cabinet is not practical enough, it is better to put it outside. Also, never install door-type trash cans and countertop trash cans. It will be very smelly to open the cabinet door in summer. It is better to put the trash can outside .

45. The small cabinet next to the dining table is good, and it is very convenient to put some things.

46. As far as I am concerned, the performance requirements of the mop bucket are not high. You can build one by yourself and lay it with tiles or mosaics that match the surrounding environment, which is beautiful and saves money.

47. How long can I live in the house after renovation? The bathroom can be nailed with nail hooks or clothes hooks for hanging things.

48. A small cupboard is designed in the bathroom to store clothes, so you don’t have to worry about forgetting to take clean clothes when taking a shower.

49. It is seriously impractical to use a washing machine with a dryer, except for the only yellow mildew in a year, and it is very evil. Thick clothes and bath towels should not be dried, it would be better to let the sun sterilize them. I’m overdrawn and need to save some money.

50. How long can I live in the house after renovation? I even made a laundry sink in the laundry room to wash some things by hand. I thought I used less, so I bought a very cheap faucet. Unexpectedly, this laundry pool is so convenient that it has become the most frequently used washing area in my house. What kind of rags, socks, and floor towels are all washed in there, and most of the hands are there.

51. It is really impractical to install light strips, and it has not been opened until now after the decoration is completed. When guests come, they just show off the spotlights, I completely forgot to install them. Originally, I wanted to be romantic at a party, but now there are not many opportunities to turn on the spotlights.

52. The biggest experience is that the simpler the decoration, the better, less pollution, less money, and less worry.

53. How long can I live in the house after decoration? Practical stuff:

① Reasonably designed storage room.

② The sink for washing dirt on the north balcony. It is different from the washbasin in the bathroom and the sink for washing vegetables and dishes in the kitchen.

③In the bathroom, you can pull out the faucet to wash your hair (except for tx who never wash their hair in the basin).

④ Easy-to-clean floors and suitable cleaning tools.

⑤ Countertop work lights in the kitchen.

54. How long can I live in the house after it is renovated? When buying a toilet, you must measure the hole distance of your own, or if you buy it and return it, it is really…

55. It is best to measure the level of the bathroom and kitchen floor tiles before they are dry to see if the lowest point is the floor drain, or wait until they are dry before arguing with the decoration team, many cells will die.

56. How long can I live in the house after it is renovated? The shower room in the bathroom must be large enough, and transparent glass should be used, so that showering in it will not look cramped.

57. White cement should not be used for tile pointing. It turns into black seams within a month, which is ugly to death. As a result, I bought a jointing agent and hooked it myself, which was tiring.

58. There should be a back plank under the artificial stone of the cabinet, but it was not found after installation. Now I dare not chop meat on it. It has been almost two months since I promised to reinstall it. (I only came to polish it once) .

59. How long can I live in the house after decoration? Don’t believe the designer’s demagogy. Of course, you can visit several decoration companies and extract the really useful things from each design. The key is how you want to decorate your home.

60. If the original manufacturer or developer of the floor drain has already installed that kind of deodorant “bowl”, don’t take it out.

61. Test the water after the bathroom floor tiles are pasted, and rework immediately if the water flow is slow. The running water in my house is relatively slow, and my heart softened a bit at the time, but now there is always a little water in the shower, which makes the shower head of our main bathroom, which is hundreds of silver, idle, and now I am always thinking about how to remedy it.

62. How long can I live in the house after decoration? When installing the washbasin, consider the relative positions of the mirror, the shelf for the toothbrushing cup, and the towel rack.

63. When buying a mirror, consider the position of the mirror headlight. If you don’t want to install the mirror headlight temporarily, the size of the mirror should be able to cover the line reserved for the mirror headlight.

64. Make a small cabinet on the balcony where the washing machine is placed, so that it is convenient to put some sundries, such as the sundries in washing powder. Both beautiful and practical.

65. How long can I live in the house after renovation? Be sure to pay attention to the waterproofing of the upstairs…otherwise, water will drip from the upstairs, and the hanging cabinets will be made, and the walls will be in a mess…

66. Don’t blindly follow online group buying. I later found out that some bargaining by yourself is cheaper than group buying. I personally recommend Liangju.com (Liangju decojoy). The items on it are really cheap, but they must be bought together.

67. There must be more sockets on the TV background wall, TV, dvd… Once you put it on, you will find that the sockets are not enough.

68. How long will the house be able to live after renovation? Before changing the waterway, it is necessary to consider the size of the washbasin installed in the future, for example, whether it is the left basin or the right basin, and where the water inlet and drainage should be located. Otherwise, after repairing it, you will find that the washbasin in the picture can’t hold it!

69. Regarding the curtains, it is best to keep a copy of the size for yourself, and explain to the boss that the size cannot be reduced. If it’s missing, what’s the matter? Or watch him cut the cloth yourself.

70. How long can I live in the house after decoration? Construction process of decoration:

(1) Enter the site, tear down walls, and build walls.

(2) Do a 24-hour closed water test on the floor of the bathroom and kitchen (the developer needs to complete this task).

(3) Digging trunking, water and electricity renovation and acceptance.

(4) Seal the buried wire trough to conceal the hydropower renovation project, and start waterproofing if there is no leakage in the closed water test.

(5) The bathroom and the kitchen are pasted with magnetic sheets on the wall.

(6) Carpentry enters the site, hanging ceilings, plaster moldings.

(7) Package door cover, window cover. Make wooden cabinet frames.

(8) Simultaneously make various wooden doors, shaped doors and flat pressing.

(9) Wooden panels are painted with anti-dust paint (clear oil).

(10) Leveling and laying of marble countertops on window sills.

(11) Paste the wood veneer, make the lines and install them carefully.

(12) Base treatment, grinding and leveling of the wall surface.

(13) Household utensils, paste stickers (protective edges) on the seams of the door.

(14) Oil the wall for at least three times.

(15) How long can the house be lived after decoration? Furniture paint comes into play, patch holes, and paint.

(16) Treat the corners, lay floor tiles, solid wood or composite wood floors, waterproof marble strips, and baseboards.

(17) Installation and commissioning of lamps, sanitary ware, handles, and door locks.

(18) Clean up, repair the joints of floor tiles, and remove the site.

(19) How long can the house be lived after decoration? Preliminary internal acceptance of the decoration company.

(20) The tripartite appointment time is formally checked and accepted, and delivered to the owner.

71. Before the valve of the flue is put back, it must be wiped clean to ensure that the valve can be opened and closed freely and can be opened to the maximum, otherwise it will affect the smoke exhaust effect of the range hood. You can leave two uninstalled when installing the suspended ceiling, and install the suspended ceiling after the range hood is installed and tested correctly.

72. In such a large space as the living room and dining room, the ceiling can be done without it.

73. How long will the house be able to live after the renovation? When wiring the wires, the air conditioner must be positioned properly, and the power supply should be moved as close to the air conditioner as possible, so as not to see a section of the power line when installing the air conditioner, leaving a trace of regret.

74. Measure and record the available sizes in the house by yourself. You can cover the size on the floor plan and re-lead the lines to mark it. The final size will directly affect the decoration design and furniture purchase.

75. If you choose black walnut for a small apartment with a bad line, it is always not grand enough. At this time, you need to make a choice, either to accommodate the reality or to stick to your own ideas. Of course, it is best to take both.

76. Start looking for decorators. As far as personal experience is concerned, if the house is not particularly large and you plan to decorate it simply, it seems that it is more cost-effective to find a guerrilla. It’s better to be introduced by others after it’s installed, and you have seen and agreed with your own eyes, especially for the person in charge of the decoration. The sense of responsibility and appreciation is more important. The former is more important, because if it’s just a simple decoration, in fact Almost anyone who works outside can do it, but the quality depends on the sense of responsibility.

77. How long can I live in the house after renovation? It is best to look at the main furniture such as sofa, wardrobe, dining table and chairs, cabinets, etc. in advance. If you run around, you will be too tired. You can

Find a few large home plazas with a good shopping environment, and you can see the basic trend, so the next thing you have to do is to slowly filter out suitable things according to your expected style. Some people have a good grasp of the style, and some people have a good grasp of the color. It doesn’t matter. Anyway, there is still time to think about it. If you wait until the decoration is cleared and the vacant space is waiting to go to the furniture, it is inevitable that you will reluctantly accept it instead of liking it very much.

78. It is best to write down the size of the furniture you have been optimistic about, and then go to the room to virtualize the future arrangement.

79. How long can I live in the house after renovation? The necessary documents must be kept well when buying things. This is definitely beneficial to the return and exchange of goods that may exist in the later period. Especially shopping receipts, manuals, etc. for some important items, because many things have a warranty period, and it will be troublesome if the voucher is lost.