HOMENews

How to install bath bullies

How to install bath bullies

2023-06-13 04:06:37

As people continue to improve their skills, people not only need to provide convenient objects for their lives, they also need to improve the quality. For example, at the time of bathing, it is easy to say that the hot weather, especially in the cold winter, people will be cold and shivering as soon as they take off their clothes, but a bath master can help everyone solve this problem. Bath Ba can not only provide everyone with winter warmth, but also provide everyone with warm lights.

Now people have become more and more picky, in fact, the more picky people are, the more they can see the inferior products at a glance, the survival of the fittest, and gradually those people do not look up to will be abandoned. That is, forcing businesses to produce good goods. But for a good bath bully, how should it be installed?

Part 1. Prepare for things

1. Open the ventilation hole

Determine the location of the ventilation hole on the wall (it should be slightly below the outlet of the centrifugal ventilator shell of the appliance above the ceiling to prevent the condensation of dew in the ventilation pipe from flowing into the appliance)

2. Install ventilation Windows

One end of the ventilation pipe is covered with a ventilation window, and the other end is firmly attached to the air outlet of the external wall along the ventilation window from the outside wall. The length of the ventilation pipe and the ventilation hole are filled with cement because the length of the ventilation pipe is 1.5M. When installing the ventilation pipe, it is necessary to consider that the distance between the center of the product installation position and the ventilation hole should not exceed 1.3M.

3. Determine the installation position of the bath bar

For optimal heating and results, the bath bar should be installed on the ceiling directly above the center of the bathtub or bath room. The hanging ceiling should use materials with better strength and not easy to agree. After installation, the height of the bulb from the ground should be between 2.1-2.3M. Too high or too low urban impact effect.

Part 2. Secure Bath Bully

1. Remove the shower mask

Unscrew all light bulbs, detach the spring from the ring of the mask and remove the mask. When disassembling infrared heating and bubble, gesture should be smooth, do not exert too much force.

2. Wiring

Connect one end of the interactive cable to the switch panel, and pull out the other end with the power cable from the opening hole in the ceiling. Open the terminal cover on the box, connect the cable according to the wiring diagram and terminal mark, cover the terminal cover, and secure the terminal cover with screws. Then plug the excess wire into the ceiling so that the box can be smoothly plugged into the hole.

3. Adjacent to ventilation pipe

Put the ventilation pipe into the end of the room and pull it out over the outlet of the centrifugal ventilation fan housing.

4. Push the container into the hole

Document the location of the outlet to select the accurate bias to plug the bath box into the hole.

5. Stick to the bath bully

Use four wood screws with a diameter of 4mm and a length of 20mm to secure the box to the ceiling wooden stop.

I do not know that everyone has read the above information, has no understanding of the installation of the bath ba, and now if you want to better grasp it, you need to understand its production principle and how to use it, so that every person now sees that he does not understand the equipment will ask why, it is very good, it is easier to understand what are the shortcomings, and gradually will improve.