First, how to install the integrated ceiling bath?

The first step in installing the integrated ceiling bath bar: the installation of the packing strip should be smooth and firm, determine the installation height, and draw a horizontal line. After the tiles are well affixed, the matching corner lines of the integrated ceiling are tightly fixed on the tiles in the case of horizontal, so that there are no obvious gaps.

The second step of installing the integrated ceiling bath: the lower boom and the light steel keel, the distance between the boom and keel should be one to the size of the panel. Make expansion eyes at the top and fix all the boom, connect the lower end of the boom with the hook, and then fix the main dragon skeleton in the middle of the hook, adjust the height nut so that the plane of the bottom of the main keel is 3cm away from the plane line of the edge strip and tighten it.

The third step of installing the integrated ceiling bath bar: wear clean gloves, and consider the overall beauty and symmetry on both sides of the installation gusset. Cutting method: Fix the template, cut it more than three times with a utility knife and ruler, cut the hem into a 90 degree Angle with scissors, and fold it by hand 2-3 times. The corresponding face of the cutting edge of the template is stuck in the keel, and the cutting edge face is mounted on the drawing bar, and the drawing bar is pulled out to clamp the template tightly. At this time, the triangular lifting member can be tightened with steel pliers and the main keel. When installing the middle part of the template, the two corresponding surfaces of the template are respectively stuck in the keel, the gap between the templates is controlled, and the stitching line is maintained. Note: After completing the installation of each row of formwork, the triangle hanger should be tightened with steel pliers and the main keel.

Second, how to check whether the bath is installed

What aspects do we need to pay attention to when installing bath bullies? Check whether the visual level of the corner line installation is good, to achieve 90 degree Angle without gaps, no obvious distortion. Observe the overall flatness of the gusset plate and the gap between the gusset plate and see if it is good.

Test whether the function of the electrical appliance is normal. You can turn on the switch to observe whether the electrical appliances are working normally, such as the lamp is warm, to turn on 15 seconds later, feel the heat, it is no problem. Ventilation, whether the position of the heating module is reasonable, whether the sound is normal when opened, and no obvious noise is good. After the wind is opened, it is necessary to warm 1.8-2 meters away from the wind, and feel that there is hot air, which proves that the wind is normal. This is very worthy of your attention.

In addition, we must pay special attention to this point. Check the strength of the screw. It is recommended to lower a few pieces of gusset plate, check whether the distance between the screw rod meets the installation standard, and then pull the screw rod with the appropriate tension by hand to confirm whether it is loose.

Through the above introduction, we can find that the integrated ceiling bath is very good, but when installing the integrated ceiling bath, we should pay attention to the installation steps of the integrated ceiling bath. Because the integrated ceiling bath is installed in the wet bathroom, in order to protect people’s personal safety, only after checking the integrated ceiling bath has been installed, can the bath be better used.