The masonry project is a very important part of the renovation. The good or bad masonry project is related to the overall decoration effect, see the good or bad masonry project mainly look at four details: structural transformation of the wall treatment, door treatment of materials, waterproof treatment of the bathroom, brick paving verticality of the yin and Yang corners. Here’s a look with me!
Details a: wall treatment
New and old wall junction with wire mesh
Many renovation owners in the reflection of renovation problems will mention the home wall cracks. Causes of wall cracks in addition to wall paint failed to paint, there are problems with the wall itself. Now people buy a new house or old house, may feel that the pattern is not what they want, and then in the renovation will be through the demolition of some non-load-bearing walls, laying some light walls to change the spatial pattern of the house, but if you do not pay attention to the new wall in the heart of the wall and the intersection between the old wall will appear cracks.
Solution: when building a new wall to pay attention to, 20 centimeters from the top of the place using 45 degrees oblique brick approach, which can make the wall evenly stressed, to avoid cracks in the wall settlement joints. In addition, hanging on the wall is also a good way to prevent cracks in the wall, hanging anti-cracking network in the old and new wall joints, and then painted two times, pay attention to the two times between the paint to ensure that it is completely dry time, so that it can be more comprehensive to prevent cracks in the wall.
Details two: door head treatment
Do not use the plasterboard to seal the head of the door
In addition to the wall, some newly renovated homes also appear the phenomenon of cracked door head.
Solution: seal the door head of a variety of materials, including wood and gypsum board seal the head of the most vulnerable to deformation, because these two materials are susceptible to moisture deformation, so that the door head uneven stress, cracks. It is best to use red brick or galvanized angle iron to seal the door, such materials are hard, stable, not easy to deformation, to prevent the door head force settlement and wall cracking.
Details three: waterproof treatment
Waterproof slope and waterproof double protection
Kitchen and bathroom leaks, water seepage, resulting in the entire home is wet, especially the master bedroom connected to the bathroom.
Solution: waterproofing works should be done on all sides, first to do a good job of waterproofing in the slotted area, and then the entire plane. The waterproofing of the bathroom should be at least 1.8m, preferably to the top surface. If the waterproofing is done after the tiling, then the row of tiles near the ground will be empty first not to paste, installed threshold stone or do a waterproof threshold, and waterproofing slope in its inner side, and then do the ground waterproofing, so that the water is completely locked in it. After the waterproof layer is formed, to do closed water test, make sure its length reaches 24 hours.
Details four: tile paving
Wall yin and Yang corner treatment to vertical
Stay a while after the discovery of some places tile a step on the move, the phenomenon of this floor tile bulge is very common.
Solution: before laying the floor tiles, want to ensure that the ground level, if the error is too large, to level before paving. In the yin and Yang corner out paving tiles to use 45 degrees angle tiling way, so as to ensure that the yin and Yang corner tiles fit tightly.