The bathroom space is mainly used for daily washing work. The environment is usually humid and dark, so it is necessary to pay attention to waterproof and non-slip. In addition, the decoration in the bathroom mainly requires the use of waterproof materials, such as tiles, to prolong the service life. What I want to share with you today is how to accept the bathroom floor decoration? The bathroom floor acceptance standard. Let’s take a look together!
1. How to accept the floor decoration of the bathroom – the acceptance specification for the bathroom floor
How to do the bathroom floor acceptance? First of all, let’s take a look at the acceptance specifications of bathroom floor tiles. Because the main focus of the bathroom space is waterproofing, it is also necessary to pay special attention to whether the waterproof function is in place during the acceptance of the bathroom floor. Generally, a closed water test will be carried out during the renovation of the bathroom, but after completion, all bathrooms still need to be checked one by one. In addition, the basic treatment, hole cleaning and plugging, leveling layer construction, filling and sealing ointment, detail additional layer and other aspects of the toilet floor need to be checked and confirmed by the engineer and recorded before the construction can start, and each layer is waterproof. The painting of the layer also needs to be checked and confirmed by the engineer before the construction of the next layer can be carried out.
After the waterproof layer is dried, quality inspection and acceptance still need to be carried out. The acceptance items include whether the waterproof layer coating is fully coated, whether the thickness is uniform, whether it is tightly closed, and the surface should not be bulged, cracked, or warped. The waterproof and closed water test of the bathroom should ensure that there is no water seepage or wetness under the bathroom floor and around the pipeline, otherwise it needs to be reworked. In addition, the ground floor of the bathroom needs to be subjected to a second closed water test after the refined decoration design, and the experimental project requirements are the same as the first.