Toilet water pipe installation should pay attention to the water inlet set indoor main valve, wall, ground, as far as possible to use less or do not connect accessories, waterway transformation to do pipeline pressure experiment, as far as possible placed in the place where can be blocked by the toilet line of sight. Installation is very important, did not install a good chance of water leakage may become larger, so here to introduce the toilet water pipe installation precautions and toilet water pipe leakage treatment, go to see it.

Toilet water pipe installation Precautions How to deal with toilet water pipe leakage (picture from the network)

Precautions for toilet water pipe installation:

1. The water inlet should be equipped with an indoor main valve. Before installation, it is necessary to check whether the connecting parts of the water pipe are damaged, sandhole, crack and other phenomena. When installing kitchen and sanitation pipes, the size of the pipe out of the wall should take into account the final size of the wall brick after pasting, that is, the thickness of the wall brick should be considered in advance.

2. In the wall and under the ground, less or no connecting accessories should be used as far as possible to reduce the hidden points of leakage. The installation of connected accessories should ensure firm, no leakage. The design of the water pipe should consider the installation position of the washing machine faucet and the layout of the water. At the same time, pay attention to the location of the power socket is appropriate. It is necessary to determine the size of washing machine and kitchen cabinet in the kitchen cabinet, so as to leave the water position.

3. Pipeline pressure experiment should be done after waterway transformation, and the experimental pressure should not be less than 0.6MPa. The time is 20-30 minutes. The right and left positions of the shower water mixing valve are correct and installed in the middle of the bathtub (determine the size of the bathtub first). The height is 150-200mm in the middle of the bathtub. The water outlet of the Jacuzzi is reserved according to the model. Mixing water valve hole distance is generally kept at 150mm (hidden), 100mm (open), connecting rod shower according to the height of the room and the owner’s personal needs to determine the location of the water outlet.

4. The water outlet of the toilet should be placed in a place where the sight can be blocked by the toilet. One-piece toilet seat to determine the location of the water outlet according to the model, generally to stay in the middle of the toilet water outlet 200 mm. The height of the water supply reserve port (elbow) on the wall should be appropriate, not only to facilitate maintenance, but also to let the hose exposed as little as possible, and do not add the hose, to give a person with simple and beautiful vision.

How to deal with toilet water pipe leakage?

Step 1: Pinpoint the source of the leak. Water leakage will always have a source, the general water pipe is embedded in the wall, when the water pipe leaks, the wall is wet, but still can see where the water leakage. Water is coming down from the top, so follow the wet marks on the wall and you’ll find the leaking pipe.

Step 2: Mark leaking pipes. If the pipe is in the wall, then the workers have to drill holes, open the wall. If the pipe leaks outside the wall, it’s easy. Check what the pipes are made of. Such as plastic, steel, PV and so on.

Step 3: Waterproof tape. You can get this at the hardware store. It’s cheap. In the water leakage pipe outside the waterproof tape (also known as waterproof paper) wrap a few layers, and then use foam glue to wrap a layer on the outside, and then use waterproof paper to wrap on the outside of the foam, and then a layer of foam glue outside the waterproof paper, and finally hit the glass glue on the OK!

The above is the toilet water pipe installation precautions and toilet water pipe water leakage treatment knowledge introduction, I believe you should have more understanding after reading it, the content is only for your reference, I hope to help you.