First, what are the installation methods of water drain?
One of the methods of installing the floor drain: if there is the original water drain, then the original floor drain needs to be removed first, and the cutting machine needs to be cut between the floor tiles. When cutting remember not to destroy the original surrounding tile neatly. Water spraying in the process of cutting old floor drains can better complete the cutting line.
Method 2 of installing the floor drain: When the cutting is completed, knock the floor drain and the cut part with a hammer, so that there is loosening between the floor drain and the floor tile, and it is easier to remove the floor drain that needs to be replaced; After taking off the floor drain, it will be found that there is a lot of debris attached to the floor drain, in fact, it can be seen that this is the reason why the bathroom is not smooth drainage and odor, and in the long run, it is easier to breed bacteria, bugs and other things that harm people’s health.
Method 3 of installing the floor drain: Then apply the evenly mixed waterproof material to the groove and the perimeter of the new floor drain. Then put the floor drain into the groove, noting that the groove is about 1mm lower than the surrounding floor tile, and should be placed tightly. After about 10min, put the filter shaft dipped in water into the base of the floor drain, and rotate it properly so that the silica gel around the filter shaft is fully combined with the base. Put on the filter and clean the perimeter of the drain. The installation of the new floor drain is complete.
Second, what are the precautions for the installation of water drains
The purpose of installing the floor drain is to drain water, so the position of the floor drain installation should be slightly lower than the ground to facilitate drainage. Before the floor drain installation, if the drainage pipe is too close to the ground, the drainage pipe should be cut short, so as to ensure that the installed floor drain panel is slightly lower than the ground. This is one of the precautions for installing sewer drains.
In addition, in the installation of sewer drains, we can pay attention to this aspect. The purpose of installing the floor drain is to drain water, so the position of the floor drain installation should be slightly lower than the ground to facilitate drainage. Before the floor drain installation, if the drainage pipe is too close to the ground, the drainage pipe should be cut short, so as to ensure that the installed floor drain panel is slightly lower than the ground.
For the floor drain installation method, in addition to the above mentioned aspects, there is also a need to pay attention to the installation of the inner core, which is considered to be very important in the entire installation process, because only the installation of the inner core is successful, can achieve the desired effect, such as odor prevention and so on. This inner core acts as a deodorant, and the inner core can be removed and cleaned at any time! Of course, after the installation is completed, be sure not to touch water for 24 hours. In addition, you can also refer to this installation method.
When it comes to the installation of sewers, in fact, it is not difficult to say that simple is not very simple. Through the introduction of the above sewer installation steps, I believe you can more clearly understand how to install the floor drain. Professionals also remind us that when installing sewer drains, we should also pay attention to the relevant precautions.