The decoration of rough room needs to pay special attention to the steps, according to a certain plan, the entire decoration link will be carried out in an orderly manner, so as to efficiently complete all aspects of the project. So what is the simple decoration process of the blank room, the Fuwojia home network for you to introduce.
Process one, clear decoration area, understand the wall size.
1, clear the area involved in the decoration process. Especially tile area, wall paint area, wallpaper area, floor area.
2, clear the main wall size. In particular, it is necessary to design the wall size of furniture in the future.
Process two, reasonable demolition, smart use of space.
It mainly includes removing walls, building walls, shoveling walls, removing heating, replacing plastic steel Windows and so on. After demolition, the garbage should be cleaned out in time to ensure the cleanliness of the room, but also to facilitate the construction.
Hydropower transformation, try not to regret. Brick on the wall, ceiling on a letter, and then want to add a socket can be difficult. Therefore, be sure to determine the exact location of switches, lamps, basins, bathtubs, washing machines, and so on.
Before the transformation of water and electricity, the cabinet designer should come to the door for the first measurement to help you determine the transformation plan of the power supply and waterway. Water heater, it is also best to send someone to design the position of the power supply and interface according to the model you have determined.
Process three, optimize the appearance of the pipeline, strengthen the decorative effect.
Under normal circumstances, the bathroom is installed the most, bathroom decoration in our entire home decoration, is the most troublesome place, both to non-slip, but also to ensure dry, so optimize the appearance of the pipe, not only play a role in moisture, but also play a decorative effect.
Process four, the ground material decoration (tile points).
The ground material decoration (tile points), before the tile, buy a good floor drain. After the waterproofing and drawing, we are ready to put up bricks. In addition to normal tiling attention, ceramic tiles soak in water and dry; Apart from the broken tiles left for cutting, I personally emphasize the overall beauty of tiling.
Process five, beautify the rough room walls, let the walls beautiful.
Wallpaper is much better than wall paint. After the wall paint is painted, the oil worker brushes the nitrocellulose paint in the place that needs to be affixed with wallpaper, and the paint can dry out the next day, and then you can ask the master to paste the wallpaper. At first, we were worried that the wallpaper would get the white wall dirty, but later, when we pasted it, we knew that the wallpaper was really a very clean job! Note: Do not open the window for ventilation within 48 hours after wallpaper is pasted, and let it dry slowly. Say to the master, if some places are warped, ask him to help repair it.
Flow six, socket installation clever arrangement.
The socket panel can be installed in about half a day.