First, how to choose a Jacuzzi socket

1, the power socket should be used by the relevant national product quality supervision department inspection qualified products. Generally, high-grade products with flame retardant materials should be used, and low-grade and shoddy counterfeit products should not be used;

2. The electrical power socket in the house should be a safe socket, and the bathroom and other wet places should be a splash-proof socket;

3, the rated current of the power socket should be greater than 1.25 times the rated current of the equipment known to be used. The rated current of the general single-phase power socket is 10A, the special power socket is 16A, and the distribution circuit and connecting power mode of special high-power household appliances should be selected according to the actual capacity;

4, in order to plug convenient, an 86mm×86mm unit panel, the number of combined sockets is best two, at most (including switches) not more than three, otherwise using 146 panel porous sockets;

5. For household appliances (such as washing machines) that have a risk of electric shock when plugged into the power supply, a socket with a switch should be used to disconnect the power supply.

6, in more humid places, the installation of sockets should be installed at the same time waterproof box.

Second, how to connect the Jacuzzi

1. It must be installed by qualified water and electricity technicians.

2. Reserve distribution pipes and junction boxes during building construction.

3, the power supply line according to the electrical law specifications or refer to the electrical circuit diagram, reserved for independent circuit power wiring. And determine the power supply is 110 volts, the use of wire can bear 15 amps of current (wire diameter 2.0 mm square), the wire outlet and the motor in the same direction is about 10cm higher than the ground, and installed in the distribution box leakage circuit breaker if not installed in advance independent circuit leakage circuit breaker, must also be installed in the appropriate position, but do not install under the bathtub.

4. Connect the power cord and the covering insulation. Note that the power connection should be connected before the Jacuzzi is fixed and the front wall panel of the bathtub is filled with caulking agent, and ensure that the grounding wire is grounded.

5, the construction site is not completed during the decoration, it is best not to properly connect the motor power cord, if the construction needs to be connected first due to the convenience of the power cord, it is necessary to turn off the leakage circuit breaker switch to avoid the motor idling burn.

6, test run: open the faucet, until the bathtub water level is at least 100mm higher than the upper edge of the nozzle, can start the power switch, so that the Pu operation. If it does not work properly, check that the contacts are installed correctly and securely.

Jacuzzi in the selection of sockets must pay attention to waterproof and anti-leakage two cases, if there is a need to install the Jacuzzi can refer to the above content.