The decoration owner may ask, how to decorate the ceiling of the bathroom? What material is better? How to judge quality problems during installation? In fact, the bathroom ceiling is an important link that people easily overlook. It is the same as the suspended ceiling in the living room and bedroom. There are even higher demands. Here we share with you the quality acceptance issues that should be paid attention to when installing the bathroom aluminum gusset ceiling.
1. Install the surrounding frame strictly according to the level and position control line of the spring; the stressed nodes should be assembled and connected firmly with special parts as required to ensure the overall rigidity of the frame; the specifications and sizes of each keel should meet the design requirements, and the vertical and horizontal directions should be arched Uniform, compatible with each other, the metal keel is strictly forbidden to have hard bends, so as to ensure that the ceiling frame is installed firmly and flatly.
2. Before construction, the horizontal line of the ceiling should be popped up accurately. When the keel is installed, attention should be paid to make the entire bottom surface flat and the camber in the middle meet the requirements; when the keel is extended, special pendants should be used for butt joint; the joints of adjacent keels should be staggered, and the keel should not be turned to one side Inclined; hanger installation must be firm, the force of each hanger should be the same, there must be no looseness, bending, skewing phenomenon. After the keel is installed, the decorative panel should be installed after passing the inspection to ensure the flatness of the ceiling surface.
3. The aluminum buckle plate should be inspected piece by piece before installation, the corners must be regular, and the size should be consistent; the edge of the vertical and horizontal line control panel should be pulled during installation; the installation bead should be nailed according to the line; to ensure uniform and smooth joints Smooth, neat lines, tight fit.
4. For the various holes and holes (lamp openings, ventilation openings, etc.) reserved by the light steel skeleton, the structure should be provided with joists and connectors according to the requirements of the specifications and atlases. Avoid deformation and cracks around holes and holes.
5. Suspenders and frameworks must not be hung on various pipelines and equipment in the ceiling. The suspender nuts must be adjusted and tightened. The connection between light steel frameworks must be firm and reliable. In order to avoid deformation of the skeleton and make the top plate uneven and cracked.
6. When cutting aluminum gussets and blocks, the cutting angle should be well controlled, and the stubble and edge collapse of the cut should be trimmed and straightened. Avoid problems such as obvious seams, white stubble at the interface, uneven seams, and wrong seams.
7. For the holes and holes reserved for lamps and smoking holes, the wires should be placed first and then the holes should be opened to ensure that the position is accurate and the connection between the ceiling and the equipment is consistent and tight.