The decoration of the bathroom is also a very important part of the whole decoration work. In addition to the requirements for beautiful decoration, it should also be practical. It is extremely important for the waterproof and installation of the bathroom. Then the editor will introduce the waterproof installation of the bathroom What to watch out for.
1. Waterproof
1. Treatment of the waterproof layer of the toilet
First make the ground waterproof layer, the coating should be uniform, the thickness ≥ 1.5mm. Pay attention to dead angles during construction, between the wall and the ground, between the downpipe and the ground. The wall is waterproofed according to the ground, and the waterproof layer height of the surrounding side walls is ≥ 500px. For the parts with bathtubs, the waterproof layer should be all parts that can be sprayed by the shower. Of course, the waterproofing of the four walls can also be done on the top of the wall, and the roof of the bathroom can be waterproofed better.
2. Toilet waterproof test
After the waterproof construction is completed, all the sewers in the toilet should be blocked, and a “low wall” should be built at the door of the toilet for water injection test. The water injection height should be about 250px. Check after 24 hours. If there is no leakage on the walls and floors around the toilet, it means that the waterproof quality of the toilet is very good. On the contrary, it is necessary to find out the leak point and carry out maintenance.
2. Installation
1. Paste of bathroom tiles
After the closed water test is completed, let it dry for 5-7 days, and then make a layer of cement mortar on the waterproof coating. After the cement mortar protective layer is completely dry, you can paste the floor tiles. The ground should have a sufficient inclination toward the floor drain to facilitate drainage. The tiles on the floor should be non-slip and waterproof, and the wall tiles should not absorb water, otherwise there will be color difference. The color of the tile grout should be matched, not too light or too dark. After the wall and floor tiles are pasted, the normal decoration on the ground can be carried out.
2. Matters needing attention in toilet decoration details
The water heater is best installed on a load-bearing wall and is strong. It is best to leave enough space between the two ends of the water heater and the wall for easy maintenance; the size and height of the washbasin countertop should be moderate (varies according to height H75-2125px), and the undermount basin is easy to clean. The waterway requirements of the washbasin: the distance between the cold and hot water is 1250px from the ground, and the distance between the cold and hot water is 10-375px. It is best to ensure that the hot and cold water pipes are in the center of the washbasin; , Mirrors, and doors should be protected from fog and water.
The above is the information about the bathroom decoration that Xiaobian introduced to you. Pay attention to the uniformity of the waterproof layer during construction, especially pay attention to several dead corners.