首页资讯

Toilet waterproof three process description

Toilet waterproof three process description

2022-12-13 08:12:24

As we all know, the bathroom is an area with a large water consumption, so if the waterproofing work is not done well in this area, the troubles caused in the later period will continue, and it will also have a great impact on the harmonious relationship between neighbors.

It can be seen that the waterproofing of the bathroom must be done. Let me go with the editor to see the importance of waterproofing the bathroom and what are the processes of waterproofing the bathroom?

The importance of bathroom waterproofing

When decorating the residence, the transformation of water and electricity is inevitable, and at this time it is bound to destroy the waterproof layer made by the developer. Therefore, in order to strengthen waterproof settings, protect property safety, and avoid disputes between neighbors, new house decoration Waterproofing must be done well at the time, even if it is not damaged, waterproofing must be done twice, because the waterproofing done by the developer is quite poor in quality.

What’s the harm in not being waterproof?

I believe everyone knows that water is a pervasive medium, especially for areas such as kitchens and bathrooms that are exposed to a large amount of water; as long as there is a leak in one area, it will cause the entire floor to form a string of water to penetrate downstairs, destroying the relationship between neighbors. In serious cases, it will cause legal disputes. In addition, the cost of re-doing waterproofing is about several times that of before decoration.

Bathroom waterproofing process

1. Brush the waterproof paint for the first time

Before starting work, first of all, ensure the cleanliness and dryness of the construction site. Then, when painting waterproof products, be sure to paint them all over to avoid missing areas. Of course, the height of the painting should also be consistent, and the thickness should meet the product regulations. requirements.

2. Brush the waterproof paint for the second time

When painting, keep in mind that there must be a period of time between the first and second coats, and the second coat can only be started after the first coat of paint is completely dry. The specific time is subject to the paint drying time limit. If it is too short, the waterproof effect will be greatly reduced.

3. Laying protective layer and closed water test

In order to avoid damage to the waterproof layer in later projects, it is necessary to lay a protective layer on its surface. Finally, when performing a routine closed water test, the water at the highest point on the ground should not be less than 2cm, and the storage time should be at least 12 hours. Leakage, then qualified.

This is the end of some introductions about bathroom waterproofing. I hope friends who have needs in this regard can get help!